Nevada Administrative Code
Chapter 445A - Water Controls
ON-SITE SEWAGE DISPOSAL SYSTEMS
Permits for Construction, Alteration or Expansion of Systems
Section 445A.9632 - Annual reports
Current through September 16, 2024
An owner or operator of an on-site sewage disposal system shall submit annually all reports as specified in the permit. In addition to the information required by the permit, each annual report must include a written certification prepared by a maintenance provider indicating that:
1. The system has been maintained in accordance with NAC 445A.950 to 445A.9706, inclusive;
2. The system is operating in accordance with the approved design specifications and the operations and maintenance manual prepared pursuant to NAC 445A.970; and
3. Testing samples required by the permit or the operations and maintenance manual, if any, have been analyzed and the results submitted to the Division or other administrative authority.
Added to NAC by Environmental Comm'n by R194-07, eff. 8-26-2008
NRS 445A.425, 445A.450