Nevada Administrative Code
Chapter 445A - Water Controls
ON-SITE SEWAGE DISPOSAL SYSTEMS
Permits for Construction, Alteration or Expansion of Systems
Section 445A.9628 - Request to alter design or increase capacity of existing system; request for extension of time to complete construction; issuance of new general permit upon completion of construction
Current through September 16, 2024
1. A person shall not alter the design or increase the capacity of an existing on-site sewage disposal system without first obtaining a letter of approval from the Division or other administrative authority. The owner or operator must submit for approval:
2. The on-site sewage disposal system may continue operation under an existing general permit during construction for a period of 1 year or until construction is completed, whichever is less. If construction is not completed within 1 year, the holder of the general permit may request an extension in writing, which may be granted in increments of not more than 1 year by the Division or other administrative authority.
3. Upon completion of the construction, a new general permit must be issued by the Division or other administrative authority if the construction meets the requirements of NAC 445A.950 to 445A.9706, inclusive.
Added to NAC by Environmental Comm'n by R194-07, eff. 8-26-2008
NRS 445A.425, 445A.445, 445A.505