Nevada Administrative Code
Chapter 445A - Water Controls
ON-SITE SEWAGE DISPOSAL SYSTEMS
Permits for Construction, Alteration or Expansion of Systems
Section 445A.9618 - Inspection of construction during critical phases by design engineer; certificate of completion

Universal Citation: NV Admin Code 445A.9618

Current through September 16, 2024

1. The design engineer shall inspect the construction of the proposed on-site sewage disposal system during critical phases of construction, including, without limitation, installation of the treatment unit, excavation of the absorption area and installation of the drain media or other effluent absorption system.

2. The design engineer shall issue a certificate of completion for the on-site sewage disposal system when he or she determines that the system complies with all applicable requirements of NAC 445A.950 to 445A.9706, inclusive, and any additional conditions required by the Division or other administrative authority. The Division or other administrative authority may request that photographic documentation of the phases of construction be submitted together with the certificate of completion.

3. A permit must not be issued until the certificate of completion, bearing the original stamp and signature of the design engineer, and the appropriate fees, if any, required pursuant to NAC 445A.963 or by an administrative authority have been received by the Division or other administrative authority.

Added to NAC by Environmental Comm'n by R194-07, eff. 8-26-2008

NRS 445A.425, 445A.430, 445A.475, 445A.500

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.