Section 445A.417 - Major modification of existing permit

Universal Citation: NV Admin Code 445A.417

Current through September 16, 2024

1. A major modification to an existing permit requires a public notice.

2. A major modification to an existing permit may extend the term of the permit for not more than 5 years.

3. For the purposes of this section, "major modifications" include:

(a) The addition of a new beneficiation process which includes, but is not limited to, heap leaching and process components for milling, which was not identified in the original application.

(b) A significant change in the location of a proposed process component or site condition which was not adequately described in the original application.

(c) A change in the proposed beneficiation process that significantly alters the characteristics of the waste stream which significantly increases the potential to degrade the waters of the State.

Added to NAC by Environmental Comm'n, eff. 9-1-89-Substituted in revision for NAC 445.24334

NRS 445A.425, 445A.465, 445A.600

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.