Nevada Administrative Code
Chapter 445A - Water Controls
MINING FACILITIES
Permits for Facilities
Section 445A.4155 - Conditions pursuant to which modification to design of facility with existing permit does not require new public notice; extension of term of existing permit disallowed
Current through September 16, 2024
1. A modification to the engineering design of a facility for which a permit has been granted by the Department does not require a new public notice if:
2. A modification to the engineering design described in subsection 1 may not extend the term of the permit.
3. Examples of modifications to the engineering design of a facility which do not constitute a major or minor modification and do not require a new public notice pursuant to subsection 1 include, without limitation:
Added to NAC by Environmental Comm'n, eff. 10-29-97; A by R046-18A, eff. 8/21/2018; A by R046-18AP, eff. 8/30/2018; A by R018-20A, eff. 8/26/2020
NRS 445A.425, 445A.465