Nevada Administrative Code
Chapter 445A - Water Controls
MINING FACILITIES
Permits for Facilities
Section 445A.409 - Issuance and maintenance of permit; maximum term and renewal of permit

Universal Citation: NV Admin Code 445A.409

Current through September 16, 2024

1. If an application is approved, a single permit must be issued for the construction, operation and closure of the facility. A valid permit must be maintained until the time required for post-closure monitoring pursuant to NAC 445A.446 is completed, as determined by the Department, and the Department has terminated the permit.

2. A permit may be issued for a maximum term of 5 years, at which time the holder of the permit may apply for renewal.

Added to NAC by Environmental Comm'n, eff. 9-1-89-Substituted in revision for NAC 445.24318; A by R046-18A, eff. 8/21/2018; A by R046-18AP, eff. 8/30/2018

NRS 445A.425, 445A.465, 445A.495

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.