Nevada Administrative Code
Chapter 445A - Water Controls
MINING FACILITIES
Permits for Facilities
Section 445A.401 - Action by Department upon application

Universal Citation: NV Admin Code 445A.401

Current through September 16, 2024

1. After determining that an application is procedurally complete, the Department shall, within 90 days, determine whether the application is technically complete, and prepare and issue:

(a) A draft permit or a notice of intent to deny the application;

(b) A fact sheet which:
(1) Identifies the location of the facility;

(2) Describes the proposed sources;

(3) Provides a description of the facility and monitoring systems;

(4) Identifies the probable receiving water; and

(5) Describes the procedures for public comment; and

(c) A public notice for each draft permit or intent to deny an application for a permit to construct, operate and close a mining and beneficiation facility.

2. The 90-day time for action by the Department may be extended by the amount of time necessary for the applicant to submit additional information necessary to make the application technically complete.

Added to NAC by Environmental Comm'n, eff. 9-1-89-Substituted in revision for NAC 445.24302

NRS 445A.425, 445A.465

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.