If the facility is located in an area where the mean diurnal temperature does not exceed 0 degrees Centigrade for 30 days or more a plan for the seasonal closure of the process components must be prepared. The plan must describe:
1. The impact this change in the weather will have on the process components, including, but not limited to, a discussion of the possible closure of individual process components;
2. Those activities which must be undertaken to prepare those process components which may be potentially affected by the low temperatures;
3. The activities which will be maintained during this time of closure; and
4. The conditions that would allow operations to resume.
Added to NAC by Environmental Comm'n, eff. 9-1-89-Substituted in revision for NAC 445.24298
NRS 445A.425, 445A.465