Nevada Administrative Code
Chapter 445A - Water Controls
MINING FACILITIES
Permits for Facilities
Section 445A.399 - Preparation of plan for seasonal closure of process components

Universal Citation: NV Admin Code 445A.399

Current through September 16, 2024

If the facility is located in an area where the mean diurnal temperature does not exceed 0 degrees Centigrade for 30 days or more a plan for the seasonal closure of the process components must be prepared. The plan must describe:

1. The impact this change in the weather will have on the process components, including, but not limited to, a discussion of the possible closure of individual process components;

2. Those activities which must be undertaken to prepare those process components which may be potentially affected by the low temperatures;

3. The activities which will be maintained during this time of closure; and

4. The conditions that would allow operations to resume.

Added to NAC by Environmental Comm'n, eff. 9-1-89-Substituted in revision for NAC 445.24298

NRS 445A.425, 445A.465

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.