Nevada Administrative Code
Chapter 445A - Water Controls
MINING FACILITIES
Operation and Design of Facilities
Section 445A.427 - Duties of holder of permit upon construction or modification of process component

Universal Citation: NV Admin Code 445A.427

Current through September 16, 2024

Within 30 days after completing construction on a new process component or monitoring system specified in the permit or materially modifying an existing process component or monitoring system specified in the permit, the holder of the permit shall submit a report to the Department for review and approval which must include, without limitation:

1. As-built drawings of the process component or monitoring system specified in the permit and identification of any deviations from the previously approved design;

2. A summary of the quality assurance and quality control procedures which were carried out during construction and the associated test results;

3. The final operating plans required by NAC 445A.398 which have been revised to reflect modifications made during construction, including, without limitation, any necessary updates to the tentative plan for permanent closure of the facility; and

4. The locations of all monitoring points set forth in the permit, which must be expressed in meters and decimals of meters, using the Nevada Coordinate System of 1983 in accordance with the requirements of chapter 327 of NRS.

Added to NAC by Environmental Comm'n, eff. 9-1-89-Substituted in revision for NAC 445.24348; A by R018-20A, eff. 8/26/2020

NRS 445A.425, 445A.465

Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.