Nevada Administrative Code
Chapter 445A - Water Controls
FINANCIAL ASSISTANCE FOR CONSTRUCTION OF WASTEWATER TREATMENT WORKS AND POLLUTION CONTROL PROJECTS
Preliminary Planning of Projects
Section 445A.734 - Proposed wastewater treatment works: Cost-effect analysis
Current through September 16, 2024
1. A cost-effect analysis prepared pursuant to NAC 445A.733 must include:
2. The planning period used in the analysis must be 20 years.
3. The monetary costs to be considered in the analysis must include the present worth or equivalent annual value of all capital costs and operation and maintenance costs.
4. The forecasts of population contained in the analysis must be consistent with those prepared by the Department of Taxation.
5. As used in this section, "industrial user" means any nongovernmental, nonresidential user of a publicly owned treatment works who is identified in the Standard Industrial Classification Manual, 1972 edition, of the Office of Management and Budget under one of the following divisions:
A copy of the Manual may be obtained by mail from the Superintendent of Documents, U.S. Government Printing Office, P.O. Box 979050, St. Louis, Missouri 63197-9000, or by toll-free telephone at (866) 512-1800, for the price of $24.
Added to NAC by Environmental Comm'n, eff. 9-19-90-Substituted in revision for NAC 445.42101
NRS 445A.135