Nevada Administrative Code
Chapter 444 - Sanitation
SEWAGE DISPOSAL
Individual Sewage Disposal Systems
- Section 444.784 - Permits: Approval for new construction required; request for approval; nature and duration
- Section 444.786 - Permits: Denials; procedure for review of actions taken by health authority; appeals; validity and extension
- Section 444.788 - Inspections
- Section 444.790 - Lot size
- Section 444.792 - Location
- Section 444.794 - Slope requirements
- Section 444.796 - Performance of percolation test by property owner; verification of certain data by engineer
- Section 444.7962 - Determination of appropriate percolation test procedure
- Section 444.7964 - Fast percolation test procedure
- Section 444.7966 - Presoaking procedure for slow percolation test
- Section 444.7968 - Slow percolation test procedure
- Section 444.797 - Sample form for percolation test
- Section 444.7972 - Sample log for profile of soil
- Section 444.798 - Approved cleanout; building sewer
- Section 444.804 - Construction of septic tank
- Section 444.806 - Precast septic tanks
- Section 444.808 - Built-in-place septic tanks
- Section 444.810 - Coated steel septic tanks
- Section 444.815 - Plumbing accessory structure into system serving single-family dwelling
- Section 444.818 - Limitations and site requirements
Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.