Nevada Administrative Code
Chapter 444 - Sanitation
SEWAGE DISPOSAL
Discharge and Treatment of Liquid Waste and Wastewater
Section 444.8318 - Aerobic wastewater treatment unit: Inspection
Universal Citation: NV Admin Code 444.8318
Current through September 16, 2024
1. The construction of an aerobic wastewater treatment unit must be inspected and verified by an engineer. The inspections must be conducted when:
(a) The absorption trenches have been
excavated or, if an elevated mound system is to be used, when the basal area of
the mound has been scarified;
(b)
The distribution piping has been placed in the aggregate;
(c) The system has been covered with soil;
and
(d) All the pumps, switches,
alarms, aeration units and other components associated with the individual
sewage disposal system have been installed. The engineer or homeowner, as
appropriate, shall verify that the operational liquid levels are set as
specified by the design plans.
2. The engineer shall, within 30 days after the date on which the construction of the system is completed, submit a letter to the administrative authority stating that the system was constructed in accordance with the approved plans.
Added to NAC by Bd. of Health by R129-98, eff. 3-25-99; A by R100-07, 10-31-2007
NRS 439.200, 444.650
Disclaimer: These regulations may not be the most recent version. Nevada may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.