Nevada Administrative Code
Chapter 338 - Public Works Projects
CONTRACTS INVOLVING CONSTRUCTION MANAGERS AT RISK
Contracts Between Construction Managers at Risk and Subcontractors to Provide Labor, Materials or Equipment on Projects
Section 338.620 - Proposals: When considered responsive; process if fewer than three received; envelopes must be time stamped
Current through December 31, 2024
1. To be considered responsive a proposal must:
2. If a construction manager at risk has determined that three or more subcontractors are qualified to submit proposals for a trade or scope of work and has received fewer than three proposals for that trade or scope of work at the time proposals are opened, the construction manager at risk may not open any proposal for that trade or scope of work until the construction manager at risk receives from the public body or its authorized representative written directions concerning the manner in which to proceed. The public body has complete discretion to develop the written directions and the construction manager at risk must proceed in a manner consistent with the written directions developed by the public body. If the public body directs the construction manager at risk to solicit additional proposals, a subcontractor that has submitted a proposal may withdraw the proposal.
3. A construction manager at risk shall time stamp all envelopes containing proposals to provide labor, materials or equipment on a public work which are submitted by subcontractor.
Added to NAC by Pub. Works Bd. by R099-11, eff. 5-30-2012
NRS 338.16995, 341.070, 341.110