Nebraska Administrative Code
Topic - PUBLIC SERVICE COMMISSION
Title 291 - NEBRASKA PUBLIC SERVICE COMMISSION
Chapter 13 - MODULAR HOUSING UNIT CONSTRUCTION RULES AND REGULATIONS
Section 291-13-004 - COMPLIANCE ASSURANCE QUALITY CONTROL PROGRAM

Current through September 17, 2024

004.01 General: It shall be the manufacturer's responsibility to execute every aspect of the compliance assurance program. The manufacturer shall continue to be responsible for all corrective actions required. Each manufacturer must obtain approval of their compliance assurance program from the Commission.

004.02 Requirements of Manufacturer: The manufacturer of modular housing units shall submit the following, at a minimum, in duplicate:

004.02A Compliance assurance manual with index.

004.02B Installation procedures with appropriate inspection procedures. Utility hook-up information shall contain appropriate inspection criteria and test description.

004.02C Identification of the manufacturer's representative who will be assigned the responsibility for implementing the compliance assurance program, and define such individual's functional obligation, responsibility and authority. The Commission shall be advised of any subsequent change.

004.02D A statement identifying who is responsible directly, or by means of an agent, for timely and effective performance of service and repairs related to code compliance.

004.02E Changes to the compliance assurance manual.

004.03 Requirements of Inspection Agencies: To ensure that the final product conforms to the adopted construction standards set forth in Subsection 001.03, "Standards for Modular Housing Units", inspection agencies shall follow the following requirements:

004.03A Be totally familiar with the procedures, materials, and design specifications, as stated in the manufacturer's approved design plans and compliance assurance manual.

004.03B During the in-plant inspection, the inspector shall check for, but not be limited to, the following:
004.03B1 Floor Framing
004.03B1a Materials: Structural, framing members - joists, beams, stringers, blocking, bridging.
004.03B1a(1) Species

004.03B1a(2) Grade

004.03B1a(3) Size(s)

004.03B1a(4) Moisture Content

004.03B1a(5) Preservative Treatment

004.03B1a(6) Condition/ Tolerances (e.g., warp, bow, splits, twist)

004.03B1b Operations:
004.03B1b(1) Measuring and Cutting

004.03B1b(2) Drilling and Notching

004.03B1b(3) Layout/Spacing

004.03B1b(4) Framing for Floor Openings (e.g., stairwells)

004.03B1c Fasteners: Nails, bolts/screws, joist hangers.
004.03B1c(1) Size

004.03B1c(2) Type/Grade

004.03B1c(3) Condition

004.03B1d Connections:
004.03B1d(1) Number (of fasteners)

004.03B1d(2) Location and Spacing

004.03B1d(3) Method (e.g., toenail, end-nail)

004.03B1d(4) Bearing of Members

004.03B1d(5) Washers (with bolts/screws)

004.03B1d(6) Workmanship

004.03B2 Floor Insulation:
004.03B2a Materials: Moisture barrier, thermal insulation.
004.03B2a(1) Size (e.g., thickness, weight)

004.03B2a(2) Type/Grade

004.03B2a(3) Condition (e.g., dry, undamaged)

004.03B2b Installation:
004.03B2b(1) Moisture Barrier

004.03B2b(2) Thermal Insulation

004.03B2b(3) Workmanship

004.03B3 Floor Sheathing:
004.03B3a Materials: Plywood, proprietary sheathing types.
004.03B3a(1) Size (e.g., thickness)

004.03B3a(2) Type/Grade

004.03B3a(3) Condition/ Tolerances

004.03B3b Fasteners:
004.03B3b(1) Nails, Staples

004.03B3b(2) Adhesives

004.03B3c Installation:
004.03B3c(1) Measuring and Cutting

004.03B3c(2) Layout

004.03B3c(3) Nails, Staples

004.03B3c(4) Adhesives

004.03B3c(5) Methods

004.03B4 Wall Framing and Setting:
004.03B4a Materials: Structural framing members - studs, plates, and lintels.
004.03B4a(1) Species

004.03B4a(2) Grade

004.03B4a(3) Size(s)

004.03B4a(4) Moisture Content

004.03B4a(5) Condition/ Tolerances (e.g., warp, bow, splits, twist)

004.03B4b Operations:
004.03B4b(1) Measuring and Cutting

004.03B4b(2) Drilling and Notching

004.03B4b(3) Layout/Spacing

004.03B4b(4) Framing for Wall Openings

004.03B4c Fasteners: Nails, bolts/screws, staples.
004.03B4c(1) Size

004.03B4c(2) Type/Grade

004.03B4c(3) Condition

004.03B4d Connections:
004.03B4d(1) Number (of fasteners)

004.03B4d(2) Location and Spacing

004.03B4d(3) Method (e.g., toenail, end-nail)

004.03B4d(4) Bearing of Members

004.03B4d(5) Plumb and Square

004.03B4d(6) Workmanship

004.03B4e Erection/Setting of Walls:
004.03B4e(1) Connections/ Fasteners

004.03B4e(2) Bearing of Members

004.03B4e(3) Workmanship

004.03B5 Wall Insulation:
004.03B5a Materials: Moisture barrier, thermal insulation.
004.03B5a(1) Size (e.g., thickness, weight)

004.03B5a(2) Type/Grade

004.03B5a(3) Condition (e.g., dry undamaged)

004.03B5b Installation:
004.03B5b(1) Moisture Barrier

004.03B5b(2) Thermal Insulation

004.03B6 Interior Wall Covering:
004.03B6aMaterials: Gypsum Wallboard
004.03B6a(1) Size (thickness)

004.03B6a(2) Type/Grade

004.03B6a(3) Condition

004.03B6b Fasteners:
004.03B6b(1) Nails, screws, wallboard clips

004.03B6b(2) Adhesives

004.03B6c Installation:
004.03B6c(1) Nails, Screws

004.03B6c(2) Adhesives

004.03B6c(3) Method

004.03B7 Ceiling/Roof Framing and Setting:
004.03B7a Materials: Structural framing members - rafters, joists, roof trusses.
004.03B7a(1) Species

004.03B7a(2) Grade

004.03B7a(3) Sizes

004.03B7a(4) Moisture Content

004.03B7a(5) Condition/ Tolerances (e.g., warp, bow, splits, twist)

004.03B7b Operations:
004.03B7b(1) Measuring and Cutting

004.03B7b(2) Drilling and Notching

004.03B7b(3) Layout/Spacing

004.03B7b(4) Laps and Splices

004.03B7b(5) End Bearing

004.03B7b(6) Framing for Openings

004.03B7c Fasteners: Nails, bolts/screws, truss plates
004.03B7c(1) Size

004.03B7c(2) Type/Grade

004.03B7c(3) Condition

004.03B7d Connections:
004.03B7d(1) Number (of fasteners)

004.03B7d(2) Location and Spacing

004.03B7d(3) Method (e.g., toenail, end-nail)

004.03B7d(4) Bearing of Members

004.03B7d(5) Plumb and Square

004.03B7d(6) Workmanship

004.03B7e Erection/Setting of Ceilings/ Roof:
004.03B7e(1) Connections/ Fasteners

004.03B7e(2) Bearing of Members

004.03B7e(3) Workmanship

004.03B8 Interior Ceiling Covering:
004.03B8a Materials: Gypsum Wallboard.
004.03B8a(1) Size (thickness)

004.03B8a(2) Type/Grade

004.03B8a(3) Condition

004.03B8b Fasteners:
004.03B8b(1) Nails, Screws, Wallboard Clips

004.03B8b(2) Adhesives

004.03B8c Installation:
004.03B8c(1) Nails, Screws

004.03B8c(2) Adhesives

004.03B8c(3) Method

004.03B9 Plumbing:
004.03B9a Materials:
004.03B9a(1) Pipe - D.W.V.

004.03B9a(2) Pipe - Water Supply and Distribution

004.03B9a(3) Pipe - Gas Fuel Supply Piping

004.03B9a(4) Plumbing Fixtures/Drains (traps, trap arms)

004.03B9a(5) Valves

004.03B9a(6) Appliances and Equipment

004.03B9a(7) Miscellaneous - Air gaps, pipe coatings, compounds, solder

004.03B9b Install Drainage System:
004.03B9b(1) Piping

004.03B9c Install Venting System:
004.03B9c(1) Installation

004.03B9d Install Traps and Trap Arms:
004.03B9d(1) Installation

004.03B9e Install Joints and Connections:
004.03B9e(1) Installation

004.03B9f Install Indirect Waste Piping, Wet Vented Systems And Special Wastes:
004.03B9f(1) Installation

004.03B9g Install Plumbing Fixtures:
004.03B9g(1) Installation

004.03B9h Install Water Distribution System:
004.03B9h(1) Installation

004.03B9i Install Fuel Gas Piping:
004.03B9i(1) Installation

004.03B9J Install Water Heater and Vents:
004.03B9j(1) Installation

004.03B10 Electrical:
004.03B10a Materials:
004.03B10a(1) Service Equipment

004.03B10a(2) Distribution Panel and Load Center

004.03B10a(3) Feeder Circuits

004.03B10a(4) Branch Circuits

004.03B10a(5) Fixed Appliances, Ranges, Water Heaters

004.03B10a(6) Outlet Boxes, Switches, Junction Boxes, Fittings

004.03B10a(7) Lighting Fixtures, Lampholders and Lamps

004.03B10b Install Electrical Service:
004.03B10b(1) Identification

004.03B10b(2) Mounting Cabinet

004.03B10b(3) Service Entrance

004.03B10b(4) Grounding Continuity

004.03B10b(5) Gutter at Service

004.03B10b(6) Service Disconnect

004.03B10b(7) Workmanship

004.03B10c Install Distribution:
004.03B10c(1) Identification

004.03B10c(2) Mounting

004.03B10c(3) Over Current 111Protection

004.03B10c(4) Grounding and Bonding

004.03B10c(5) Workmanship

004.03B10d Install Feeder Circuits:
004.03B10d(1) Identification

004.03B10d(2) Drilling, Boring-Studs/Joists

004.03B10d(3) Mechanical Protection

004.03B10d(4) Mechanical Continuity

004.03B10d(5) Installation

004.03B10d(6) Workmanship

004.03B10e Install Branch Circuits:
004.03B10e(1) Identification

004.03B10e(2) Drilling, Boring-Studs/Joists

004.03B10e(3) Mechanical Protection

004.03B10e(4) Mechanical Continuity

004.03B10e(5) Installation

004.03B10e(6) Workmanship

004.03B10f Install Fixed Appliances, Ranges, Water Heaters:
004.03B10f(1) Marking

004.03B10f(2) Supply Circuits

004.03B10f(3) Location

004.03B10f(4) Grounding

004.03B10f(5) Over Current Protection

004.03B10f(6) Workmanship

004.03B10g Install Outlet, Switch and Junction Boxes and Fittings:
004.03B10g(1) Identification

004.03B10g(2) Mounting and Installation

004.03B10g(3) Size and Shape

004.03B10g(4) Covers and Canopies

004.03B10g(5) Conductors

004.03B10g(6) Accessibility

004.03B10g(7) Grounding, Bonding and Insulation from Supports

004.03B10g(8) Workmanship

004.03B10h Lighting Fixtures, Lampholders, Lamps, Rosettes, Outlet Boxes:
004.03B10h(1) Identification

004.03B10h(2) Installation

004.03B10i Testing of System:
004.03B10i(1) Continuity Test

004.03B10i(2) Functional Test of Fixtures and Appliances

004.03B11 Mechanical (HVAC) System:
004.03B11a Materials:
004.03B11a(1) Heating Equipment, Furnaces, Room Heaters

004.03B11a(2) Ventilation Systems

004.03B11a(3) Air Conditioning Equipment

004.03B11a(4) Miscellaneous Heat Producing Appliances - Ranges, Dryers

004.03B11b Install Warm Air Furnaces:
004.03B11b(1) Identification

004.03B11b(2) Installation

004.03B11b(3) Circulating Air Supply

004.03B11b(4) Conditioned Air Supply

004.03B11b(5) Combustion Air

004.03B11b(6) Workmanship

004.03B11c Vents/Chimneys:
004.03B11c(1) Identification

004.03B11c(2) Type/System

004.03B11c(3) Size/Area

004.03B11c(4) Location/Support

004.03B11c(5) Length/Pitch/ Clearance

004.03B11c(6) Termination

004.03B11c(7) Connectors

004.03B11c(8) Unused Openings

004.03B11c(9) Workmanship

004.03B11d Ducts:
004.03B11d(1) Identification

004.03B11d(2) Fastening/Support

004.03B11d(3) Location

004.03B11d(4) Plenum

004.03B11d(5) Workmanship

004.03B11e Install Floor Furnaces, Room Heaters:
004.03B11e(1) Identification/ Label/Listing

004.03B11e(2) Type/System

004.03B11e(3) Location/Access

004.03B11e(4) Combustion Air Supply

004.03B11e(5) Grilles/Registers

004.03B11e(6) Support

004.03B11e(7) Protection from Damage

004.03B11e(8) Controls-Manual/ Auto

004.03B11e(9) Electrical Connectors

004.03B11e(10) Workmanship

004.03B11f Install Ventilation System:
004.03B11f(1) Ducts

004.03B11f(2) Hoods

004.03B11f(3) Workmanship

004.03B11g Install Air Conditioning Equipment:
004.03B11g(1) Identification

004.03B11g(2) Location

004.03B11g(3) Support

004.03B11g(4) Access

004.03B11g(5) Circulating Air Supply

004.03B11g(6) Return Air Limitation

004.03B11g(7) Workmanship

004.03B11h Install Miscellaneous Heat Producing Appliances, Ranges, Dryers:
004.03B11h(1) Identification

004.03B11h(2) Location

004.03B11h(3) Clearances

004.03B11h(4) Ducts

004.03B11h(5) Workmanship

004.03B11i Testing of Mechanical Merchandise:

004.03B12 Ceiling Insulation:
004.03B12a Materials: Moisture Barrier, Thermal Insulation
004.03B12a(1) Size (e.g., thickness, weight)

004.03B12a(2) Type/Grade

004.03B12a(3) Condition (e.g., dry, undamaged)

004.03B12b Installation:
004.03B12b(1) Moisture Barrier

004.03B12b(2) Thermal Insulation

004.03B13 Miscellaneous Components (Window, Exit Door, and Stairway) Installation:
004.03B13a Materials:
004.03B13a(1) Doors and Windows

004.03B13a(2) Stairways

004.03B13b Installation:
004.03B13b(1) Door and Windows

004.03B13b(2) Stairways

004.03B14 Wall Sheathing:
004.03B14a Materials: Plywood, fiberboard, proprietary sheathing types.
004.03B14a(1) Size (e.g., thickness)

004.03B14a(2) Type/Grade

004.03B14a(3) Condition/Tolerance

004.03B14b Fasteners:
004.03B14b(1) Nails, Staples

004.03B14b(2) Adhesives

004.03B14c Installation:
004.03B14c(1) Measuring and Cutting

004.03B14c(2) Layout

004.03B14c(3) Nails, Staples

004.03B14c(4) Adhesives

004.03B15 Exterior Siding:
004.03B15a Materials:
004.03B15a(1) Exterior Wall Siding

004.03B15a(2) Weather Flashing

004.03B15a(3) Caulking Compounds/Mastics

004.03B15b Fasteners:
004.03B15b(1) Nails, Staples

004.03B15b(2) Adhesives

004.03B15c Installation:
004.03B15c(1) Flashing

004.03B15c(2) Layout

004.03B15c(3) Weather Tightness

004.03B15c(4) Nails, Staples

004.03B15c(5) Adhesives

004.03B15c(6) Caulking Application

004.03B15c(7) Corner Treatment

004.03B15c(8) Painting/Finishing

004.03B16 Roof Sheathing:
004.03B16a Materials: Plywood, proprietary sheathing types.
004.03B16a(1) Size (e.g., thickness)

004.03B16a(2) Type/Grade

004.03B16a(3) Condition/Tolerances

004.03B16b Fasteners:
004.03B16b(1) Nails, Staples, Plyclips

004.03B16b(2) Adhesives

004.03B16c Installation:
004.03B16c(1) Measuring and Cutting

004.03B16c(2) Layout

004.03B16c(3) Nails, Staples

004.03B16c(4) Adhesives

004.03B16c(5) Methods

004.03B17 Finish Roofing:
004.03B17a Materials:
004.03B17a(1) Underlayment

004.03B17a(2) Roofing

004.03B17a(3) Weather Flashing

004.03B17a(4) Nails

004.03B17b Installation:
004.03B17b(1) Underlayment

004.03B17b(2) Flashing

004.03B17b(3) Layout

004.03B17b(4) Nails

004.03B17b(5) Exposure

004.03B17b(6) Workmanship

004.03B18 Compliance Inspection and Certification:
004.03B18a Compliance Review:
004.03B18a(1) Manufacturers checklist (traveler)

004.03B18a(2) Test equipment and procedures

004.03B18a(3) Material storage

004.03B18a(4) Drawing availability

004.03B18a(5) Design Referral responses

004.03B18b Seal Review:
004.03B18b(1) Contents

004.03B18b(2) Location

004.03B18b(3) Attachment

004.03B18c Construction Compliance Certificate Review:

004.03B18d Manufacturer's Data Plate:
004.03B18d(1) Contents

004.03B18d(2) Location

004.03B18d(3) Attachment

004.04 Initial and Monitoring In-Plant Inspection by Inspection Agencies:

004.04A Initial In-Plant Inspection: Once a Manufacturer's compliance assurance manual and plans have been approved, the inspection agency shall perform the initial inspection. The initial inspection shall consist of the inspection agency making a station-by-station thorough evaluation of the manufacturer's operation to assure that the manufacturer is operating in accordance with the criteria set forth in the previously approved compliance assurance manual and plans. In so doing, the inspection agency shall utilize the in-plant inspection checklist specified in Subsection 004.03.

If the manufacturer during the initial inspection is found to be producing units in accordance with the approved compliance assurance manual and plans, the inspection agency shall notify the manufacturer, in writing, with a copy being forwarded to the Nebraska Public Service Commission.

The notification letter to the manufacturer from the inspection agency shall be signed by an authorized agent of the inspection agency and shall include the following

004.04A1 Name of inspection agency.

004.04A2 Name of inspector(s).

004.04A3 Date(s) inspection was performed.

004.04A4 Name and address of manufacturer.

004.04A5 Statement from the inspection agency stating "A thorough, complete and station-by-station inspection and evaluation of the manufacturer's construction and inspection process was performed in conformance with its approved plans and compliance assurance manual and Nebraska's standards for modular housing units, and the inspection agency is satisfied that the manufacturer can produce modular housing units in conformance with Nebraska standards for modular housing units on an ongoing basis."

004.04A6 Signed and dated by an authorized agent of the inspection agency.

004.04B If the initial inspection reveals deviations from the previously approved compliance assurance manual and plans, the inspection agency shall notify the manufacturer, in writing, of deviations, specifying in detail the observed deviations. A copy of this letter shall be sent to the Nebraska Public Service Commission. Upon notification from the plant that the specified deviations have been corrected, the inspection agency shall again make an initial inspection of the plant following the procedure previously outlined in this section 004.04A.

004.04CMonitoring In-Plant Inspections: Following notification to a manufacturer under Part 004.04A, the inspection agency shall undertake monitoring in-plant inspections at a frequency sufficient to inspect every home that will receive the Nebraska modular housing unit seal and to assure continuing compliance with the manufacturer's compliance assurance program. Additional factors which the inspection agency shall take into consideration in determining frequency of monitoring in-plant inspections are as follows
004.04C1 Production Volume

004.04C2 Design Complexity of Units

004.04C3 The qualifications of the manufacturer's own

in-house compliance control organization.

004.04C4 The experience record of the manufacturer.

004.04D The in-plant inspection agency shall utilize the in-plant inspection check list in Subsection 004.03 to assure that each construction feature (structural, mechanical, plumbing, and electrical) is fully evaluated.

004.05 Seal Issuance: Upon satisfactory completion of the initial in-plant inspection and notification letter issued to the manufacturer by the inspection agency, the manufacturer shall act in accordance with the provisions of Section 002.

Disclaimer: These regulations may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.