008.01 Test Well
Water quality samples (except for asbestos, dioxin and endothall) must be collected from a test well to demonstrate that it will meet the requirements of Title 179 prior to construction of the production well The Department may forgo this requirement if the following conditions are met:
1. The public water system's
design engineer provides justification as to why the above requirement would
not be necessary and the basis for making that determination, and
2. The system owner sends a letter to the
Department requesting approval of the project without the water quality
information. The letter must include a statement that the owner is aware that
if the water quality from the production well does not comply with the water
quality requirements of Title 179, the well may not be allowed to be placed
into service.
008.02 Production Well
Water quality information must be obtained from the production well to demonstrate that it will meet the requirements of Title 179 prior to placement into service.
Disclaimer: These regulations may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.