Nebraska Administrative Code
Topic - HEALTH AND HUMAN SERVICES SYSTEM
Title 178 - ENVIRONMENTAL HEALTH
Chapter 12 - WATER WELL CONSTRUCTION, PUMP INSTALLATION, AND WATER WELL DECOMMISSIONING STANDARDS
Section 178-12-007 - GROUND WATER MONITORING AND RECOVERY WELLS
Current through September 17, 2024
must be constructed in the following manner.
12-007.01 Well Screens: The top of the screen aperture may extend to within 2 feet of the land surface. The gravel pack thickness may be reduced so as to not compromise the surface seal.
12-007.02 Watertight Well Casing
12-007.03 Grouting the Annular Space: A non-slurry bentonite seal with a minimum thickness of 5 feet must be placed on top of the gravel pack immediately above the screen. All wells must be grouted from immediately above the non-slurry bentonite seal/fine sand to the surface in accordance with 178 NAC 12-003.07.
12-007.04 Above Ground Protection: Non-steel cased wells completed above ground must be enclosed with a steel casing embedded in the concrete pad and covered with an overlapping, vandal-resistant secured metal cap.
12-007.05 Pad: Ground water monitoring and recovery wells must have a concrete pad extending a minimum of 1 foot past the walls of the original borehole and must be a minimum of 8 inches thick. The concrete must contact the entire circumference of the casing.
12-007.06 Well Logs: The location of each well must be shown on a site diagram in addition to the driller's log, to be provided in accordance with 178 NAC 12-003.12A.
12-007.07 Nested Well Design: Wells constructed for ground water investigations may use a nested design. (See Figure 10)
12-007.08 Temporary Well Installation: A pre-notification document must be submitted to the Department 30 days before constructing a temporary well to be in use longer than 10 days (does not apply to temporary dewatering wells). The notification must indicate what type of surface seal will be provided. Temporary wells must be decommissioned within 90 days of installation and cannot be used as a monitoring, recovery, or test well on a permanent basis unless the construction complies with the provisions of Title 178 NAC 12-003.04B, or the well is granted a Declaratory Order in accordance with 178 NAC 12013 before it is constructed.