Nebraska Administrative Code
Topic - ENVIRONMENT AND ENERGY
Title 198 - RULES AND REGULATIONS PERTAINING TO AGRICULTURAL CHEMICAL CONTAINMENT
Chapter 7 - CONSTRUCTION PLAN
Section 198-7-001

Current through March 20, 2024

A construction plan will be developed for each secondary containment facility and loadout facility required in Chapters 2 and 3. The design will comply with the minimum requirements set forth in these regulations. A management program will be developed and include the recycle, reuse, or disposal method for accumulations or releases collected in the facility. The construction plan will be kept up to date and on file at the facility or the nearest office location for the facility. The plan will include:

001.01 A scale drawing of plans and specifications for the facility, including storage containers, buildings and loadout areas where applicable.

001.02 A copy of the plumbing diagram for the facility which includes the location, size and type of appurtenances. Specify the type and location of any backflow prevention devices as required by Chapter 4, 006 and 007.

Disclaimer: These regulations may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.