Nebraska Administrative Code
Topic - ENVIRONMENT AND ENERGY
Title 130 - NEBRASKA DEPARTMENT OF ENVIRONMENTAL QUALITY
Chapter 4 - CONSTRUCTION AND OPERATING PERMIT, CONSTRUCTION APPROVAL, MAJOR MODIFICATION APPLICATION: TERMS AND CONDITIONS
Section 130-4-009

Current through March 20, 2024

The Department shall be notified if sloughing, slope failure, or excessive erosion of a facility occurs, or where other failure has occurred. The owner or permittee may be required to provide an engineering evaluation and any other information the Department determines necessary to ensure that the design and construction is acceptable such that the excessive erosion or other failure is not likely to recur. In the event the existing design or construction is determined to be inadequate, the owner or permittee may be required to submit an application for a major modification.

Disclaimer: These regulations may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.