Nebraska Administrative Code
Topic - ENVIRONMENT AND ENERGY
Title 124 - ONSITE WASTEWATER TREATMENT SYSTEMS
Chapter 1 - DEFINITIONS
Section 124-1-016 - "Design flow"
Universal Citation: 124 NE Admin Rules and Regs ch 1 ยง 016
Current through September 17, 2024
"Design flow" means the maximum volume of wastewater estimated to be generated by a dwelling or non-dwelling facility in a twenty-four-hour period. It includes both a typical operating capacity and a surge capacity for the system during periodic heavy use events. The sizing and design of the onsite wastewater treatment system components are based on the design flow.
Disclaimer: These regulations may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.