Construction will be in accordance with the approved plans and specifications. When changes to the approved plans and specifications are desired, the following types of changes will be submitted to the Department for review and approval:

001.01 Changes that affect the hydraulic or treatment capacity of a wastewater works.

001.02 Changes to the location or elevation of a wastewater works.

001.03 Changes that alter or modify a treatment process.

001.04 Changes to the method of discharging wastewater, to the discharge location, or that increase wastewater seepage into the ground.

001.05 Changes to the number of installed appurtenances (for example: manholes, diffusers, valves) from the number originally approved in the plans and specifications.

001.06 Changes to the type of mechanical equipment or to the materials specified.

001.07 Changes to the construction quality acceptance testing requirements for the wastewater works.

001.08 Changes to the pipe material, location, slope, or diameter of a sanitary sewer or wastewater piping system or the construction of additional sewers or pipes.

001.09 Changes that could increase the health or safety risk to utility workers or the public.

Disclaimer: These regulations may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.