Nebraska Administrative Code
Topic - ELECTRICAL BOARD
Title 100
Rule 12 - Temporary Services

Current through March 20, 2024

The installer or electrical contractor must submit an application for State electrical inspection for the temporary service.

1. The inspection fee will be based on service capacity and number of branch circuits.

2. The application must be submitted a minimum of five working days prior to the date energization is required.

3. The State Electrical Inspector may verbally authorize energization following inspection if the installation is in compliance with the provisions of the National Electrical Code referenced in Section 81-2104(5) of the State Electrical Act.

Disclaimer: These regulations may not be the most recent version. Nebraska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.