Subchapter 38.5.84 - Small Generator Interconnection
Rule 38.5.8402 - APPLICABILITY
Universal Citation: MT Admin Rules 38.5.8402
Current through Register Vol. 18, September 20, 2024
(1) The interconnection procedures set forth in this subchapter apply to applicants proposing to install and interconnect a small generator facility to an EDC's system that satisfies the following criteria:
(a) The small generator facility
must be sited on the utility customer's premises;
(b) The customer installing the small
generator facility must be in good standing with the utility;
(c) The proposed small generator facility's
point of interconnection may not be on a transmission line;
(d) The power produced from the small
generator facility must be contained on the EDS and not flow onto the
transmission system; and
(e) The
power exported by an interconnection customer can only be sold to the
EDC.
69-3-103, MCA; IMP, 69-3-102, MCA;
Disclaimer: These regulations may not be the most recent version. Montana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.