Administrative Rules of Montana
Department 17 - ENVIRONMENTAL QUALITY
Chapter 17.38 - PUBLIC WATER AND SEWAGE SYSTEM REQUIREMENTS
Subchapter 17.38.1 - Public Water and Sewer Plans, Cross Connections, and Drilling Water Wells
Rule 17.38.106 - FEES
Current through Register Vol. 18, September 20, 2024
(1) The purpose of this rule is to establish fee schedules to be used to calculate fees to be paid to the department for review of plans and specifications for public water supply and public sewage systems, as required under Title 75, chapter 6, part 1, MCA, and ARM 17.38.101.
(2) Department review will not be initiated until fees calculated under (2)(a) through (f) and (5) have been received by the department. If applicable, the final approval will not be issued until the calculated fees under (3) and (4) have been paid in full. The total fee for the review of a set of plans and specifications is the sum of the fees for the applicable parts or subparts listed in these subsections:
SCHEDULE I
Policies |
|
ultra violet disinfection |
$ 875 |
point-of-use/point-of-entry treatment |
$ 875 |
Section 1.0 Engineering Report |
$ 350 |
Section 3.1 Surface water |
|
quality and quantity |
$ 875 |
structures |
$ 875 |
Section 3.2 Ground water |
$ 1,050 |
Section 4.1 Microscreening |
$ 350 |
Section 4.2 Clarification |
|
standard clarification |
$ 875 |
solid contact units |
$ 1,750 |
Section 4.3 Filtration |
|
rapid rate |
$ 2,190 |
pressure filtration |
$ 1,750 |
diatomaceous earth |
$ 1,750 |
slow sand |
$ 1,750 |
direct filtration |
$ 1,750 |
biologically active filtration |
$ 1,750 |
membrane filtration |
$ 1,750 |
micro and ultra filtration |
$ 1,750 |
bag and cartridge filtration |
$ 520 |
Section 4.4 Disinfection |
$ 875 |
Section 4.5 Softening |
$ 875 |
Section 4.6 Ion Exchange |
$ 875 |
Section 4.7 Aeration |
|
natural draft |
$ 350 |
forced draft |
$ 350 |
spray/pressure |
$ 350 |
packed tower |
$ 875 |
Section 4.8 Iron and manganese |
$ 875 |
Section 4.9 Fluoridation |
$ 875 |
Section 4.10 Stabilization |
$ 600 |
Section 4.11 Taste and odor control |
$ 520 |
Section 4.12 Adsorptive media |
$ 700 |
Chapter 5 Chemical application |
$ 1,220 |
Chapter 6 Pumping facilities |
$ 1,220 |
Section 7.1 Plant storage |
$ 1,220 |
Section 7.2 Hydropneumatic tanks |
$ 520 |
Section 7.3 Distribution storage |
$ 1,220 |
Chapter 8 Distribution system per lot fee |
$ 90 |
non-standard specifications |
$ 520 |
transmission distribution (per lineal foot) |
$ 0.30 |
rural distribution system (per lineal foot) |
$ 0.04 |
sliplining existing mains (per lineal foot) |
$ 0.20 |
Chapter 9 Waste disposal |
$ 875 |
Appendix A |
|
new systems |
$ 350 |
modifications |
$ 175 |
SCHEDULE II
Chapter 10 Engineering reports and facility plans |
|
engineering reports (minor) |
$ 350 |
comprehensive facility plan (major) |
$ 1,750 |
Chapter 30 Design of sewers |
|
per lot fee |
$ 90 |
non-standard specifications |
$ 520 |
collection system (per lineal foot) |
$ 0.30 |
sliplining existing mains (per lineal foot) |
$ 0.20 |
Chapter 40 Sewage pumping station |
|
force mains (per lineal foot) |
$ 0.30 |
1000 gpm or less |
$ 875 |
greater than 1000 gpm |
$ 1,750 |
Chapter 60 Screening grit removal |
|
screening devices and comminutors |
$ 520 |
grit removal |
$ 520 |
flow equalization |
$ 875 |
Chapter 70 Settling |
$ 1,400 |
Chapter 80 Sludge handling |
$ 2,800 |
Chapter 90 Biological treatment |
$ 4,200 |
nonaerated treatment ponds |
$ 1,400 |
aerated treatment ponds |
$ 2,450 |
Chapter 100 Disinfection |
$ 1,120 |
Chapter 120 Irrigation and Rapid Infiltration Systems |
$ 1,220 |
Appendices A and C (per design) |
$ 1,220 |
SCHEDULE III
Section 3.2 Ground water |
$ 1,050 |
Chapter 6 Pump facilities |
$ 520 |
Chapter 7 Finished storage/hydropneumatic tanks |
$ 520 |
Chapter 8 Distribution system |
$ 520 |
SCHEDULE IV
Chapter 4 Pressure Dosing |
$ 350 |
Chapter 5 Septic Tanks |
$ 350 |
Chapter 6 Soil Absorption Systems |
$ 350 |
Chapter 6, Subchapter 6.8 ETA and ET Systems |
$ 875 |
Chapter 7, Subchapters 7.1, 7.2, and 7.3 Filters |
$ 350 |
Chapter 7, Subchapter 7.4 Aerobic Treatment |
$ 875 |
Chapter 7, Subchapter 7.5 Chemical |
|
Nutrient-Reduction Systems |
$ 875 |
Chapter 7, Subchapter 7.6 Alternate Advanced |
|
Treatment Systems |
$ 875 |
Chapter 8 Holding Tanks, Pit Privy, Seepage Pits, Waste Segregation, Experimental Systems |
$ 350 |
Appendix D |
$ 350 |
Non-degradation Review |
$ 520 |
SCHEDULE V
Spring box and collection lateral |
$ 440 |
SCHEDULE VI
Cisterns |
$ 520 |
(3) Fees for review of plans and specifications not covered under (2) are established by the department based on a charge of $ 150 per hour multiplied by the time required to review the plans and specifications. The review time applied to each set of plans and specifications will be determined by the review engineer and documented with time sheets.
(4) The fee for review of plans and specifications previously denied, for staff time over two hours, is $ 150 per hour, assessed in half-hour increments, multiplied by the time required to review the plans and specifications. The review time applied to each set of plans and specifications must be determined by the review engineer and documented with time sheets.
(5) The fee for review of deviations is $ 300 per deviation.
(6) Fee payment must be in the form of a check or money order made payable to the state of Montana, Department of Environmental Quality.
(7) When a resubmitted set of plans and specifications contains substantial changes in the design that require the plans and specifications to be reviewed again, the department may require an additional review fee. The additional fee will be calculated in the same manner as the original fee and based on those parts of the standard that must be reviewed again due to the change in design. The department shall give notice and provide for appeal as specified under 75-6-108(5), MCA.
AUTH: 75-6-108, MCA; IMP: 75-6-108, MCA