Current through Register Vol. 49, No. 6, March 15, 2024
PURPOSE: To make a correction and remove language
restated from statute regarding right of entry.
(1) In addition to the basic requirements for
all permits listed in
10 CSR
22-3.020, the safety permit application for a
conventional dam and reservoir shall include:
(A) Notification of the completion of
construction and application for the first safety permit for the dam and
reservoir shall be provided by the owner. The experienced professional engineer
or agency engineer who was in responsible charge of the construction work shall
certify that the construction was substantially in accordance with the approved
plans and specifications. If revisions have been made which vary considerably
from the provisions of the construction permit, it must be shown that the
revisions do not endanger public safety, life or property. This subsection
shall not be construed to excuse any person from the requirement to notify the
council or chief engineer of modifications or revisions prior to commencing the
actions and to obtain the required permits or authorization thereof;
(B) Notification of completion shall be
within two (2)-months' time after completion of construction; and
(C) As-built drawings shall be
submitted.
(2) In
addition to the basic requirements for all permits listed in
10 CSR
22-3.020, the application for a safety permit for an
industrial water retention dam and reservoir shall include:
(A) Notification of completion of the starter
dam or the initial phase of construction shall be prepared by or under the
supervision of an experienced professional engineer and shall indicate that
construction was performed in accordance with the provisions of the
construction permit;
(B)
Notification of the completion of construction and application for the first
safety permit for the dam and reservoir shall be provided by the owner. The
experienced professional engineer who was in responsible charge of the
construction work shall certify that the construction was substantially in
accordance with the approved plans and specifications. If revisions have been
made which vary considerably from the provisions of the construction permit, it
must be shown that the revisions do not endanger public safety, life or
property. This subsection shall not be construed to excuse any person from the
requirement to notify the council or chief engineer of modifications or
revisions prior to commencing the actions and to obtain the required permits or
authorization therefore;
(C)
Notification of completion shall be within two (2) months time after completion
of construction; and
(D) As-built
drawings shall be submitted.
(3) Visits for the purpose of observation of
operation and maintenance procedures may be made by the council, the chief
engineer, or a member of their staff. Visits will be at any reasonable time
following reasonable notice, except that in the case of an emergency
threatening public safety, life or property, inspection may be made at any
time.
*Original authority: 236.400, RSMo 1979; 236.405, RSMo
1979, amended 1993, 1995; 236.415, RSMo 1979, amended 1995; 236.420, RSMo 1979;
236.425, RSMo 1979; 236.440, RSMo 1979; and 236.465,RSMo
1979.