Mississippi Administrative Code
Title 2 - Agriculture and Commerce
Part 903 - MSCWW Cost Share Program
Chapter 3 - General Guidelines
Rule 2-903-3.8 - Cost Share Rates
Universal Citation: MS Code of Rules 2-903-3.8
Current through September 24, 2024
At no time will cost share rates for the Mississippi Soil and Water Conservation Cost Share Program exceed rates for the same practice in other cost share programs. The current cost share rates for eligible practices are as follows:
Soil | Erosion Control | % |
SEC-1 | Terraces | 60 |
SEC-2 | Field Borders | 60 |
SEC-3 | Grassed Waterways | 60 |
SEC-4 | Conservation Tillage (No-Till) | 60 |
SEC-5 | Water & Sediment Control Basins | 60 |
SEC-6 | Establishment of Permanent Vegetation | 60 |
SEC-7 | Critical Area Planting | 60 |
SEC-8 | Tree Planting | 60 |
SEC-9 | Grade Stabilization Structure | 60 |
SEC-10 | Strip Cropping Systems | 60 |
SEC-11 | Reduced Tillage | 60 |
SEC-12 | Cover & Green Manure Crops | 60 |
SEC-13 | Pasture & Hayland Planting | 60 |
SEC-14 | Streambank & Shoreline Protection | 60 |
SEC-15 | Chiseling and Subsoiling | 60 |
SEC-16 | Heavy Use Area Protection | 60 |
SEC-17 | Forest Land Erosion Control System | 60 |
SEC-18 | Prescribed Grazing | 60 |
SEC-19 | Nutrient Management | 60 |
Water Conservation | % | |
WC-1 | Irrigation Land Leveling | 60 |
WC-2 | Irrigation System, Tailwater Recovery | 60 |
WC-3 | Irrigation Water Conveyance Pipe Line | 60 |
WC-4 | Irrigation Storage Reservoirs | 60 |
WC-5 | Establishment of Permanent Vegetation | 60 |
WC-6 | Tree Planting | 60 |
WC-7 | Ponds | 60 |
WC-8 | Animal Waste Control Facilities | 60 |
WC-9 | Diversions | 60 |
WC-10 | Livestock Pond Renovation | 75 |
Wildlife | % | |
W-1 | Field Borders | 60 |
W-2 | Filter Strip | 60 |
W-3 | Prescribed Burning | 60 |
W-4 | Wildlife Upland Habitat Management | 60 |
W-5 | Wildlife Wetland Habitat Management | 60 |
Water Quality | % | |
WQ-1 | Integrated Crop Management | 60 |
WQ-2 | Fencing | 60 |
WQ-3 | Trough or Tank | 60 |
WQ-4 | Agrichemical Mixing Center | 60 |
WQ-5 | Structure for Water Control | 60 |
WQ-6 | Buffer Zone | 60 |
WQ-7 | Check Dam | 60 |
WQ-8 | Concrete Grid & Modular Pavement | 60 |
WQ-9 | Constructed Wetland | 60 |
WQ-10 | Detention Basin | 60 |
WQ-11 | Lined Waterway | 60 |
WQ-12 | Parking Lot Storage | 60 |
WQ-13 | Paved Flume | 60 |
WQ-14 | Rock Outlet Protection | 60 |
WQ-15 | Slope Drain | 60 |
WQ-16 | Sub Surface Drain | 60 |
WQ-17 | Water Bar | 60 |
WQ-18 | Retention Basin | 60 |
WQ-19 | Silt Fence | 60 |
WQ-20 | Permanent Seeding | 60 |
WQ-21 | Stream Crossing | 60 |
WQ-22 | Chemical Container/Used Oils-Lubricants Recycling | 0 |
WQ-23 | Cattle Feed & Waste Management Facility | 60 |
WQ-24 | Well Decommissioning | 60 |
Two or more individuals may install a "group" practice where the practices benefit each. Applications for group practice must be made by each individual participating. The maximum amount of cost share may be allowed to each applicant.
Miss. Code Ann. § 69-27-311
Disclaimer: These regulations may not be the most recent version. Mississippi may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.