Mississippi Administrative Code
Title 12 - Finance and Administration
Part 3 - Bureau of Building, Grounds and Real Property Management
Chapter 2 - Rules for the Bureau of Building, Grounds and Real Property Management
Rule 12-3-2.1 - Policies and Procedures
Section 12-3-2.1-700 - CONSTRUCTION PROCEDURES
Section 12-3-2.1-700.5 - PRODUCT LISTING
Current through March 31, 2025
Within thirty (30) days after the signing of the Contract, the Contractor will submit to the Professional five (5) copies of a complete list of all products which are proposed for installation. The list should be tabulated by specification section.
Within thirty (30) days after the signing of the Contract, the Contractor will submit to the Professional five (5) copies of a list indicating all products he proposes for substitution. This list should include:
1. Complete information substantiating the substituted product meets the specifications
2. Product:
3. Construction Methods:
4. Itemized comparison of proposed substitution with product or method specified
5. Data relating to changes in construction schedule
6. Accurate cost data on proposed substitution in comparison with product or method specified
Product List * Manufacturer's name and address * Trade name * Model or catalog designation * Manufacturer's data * Performance and test data * Reference standards |