Mississippi Administrative Code
Title 12 - Finance and Administration
Part 3 - Bureau of Building, Grounds and Real Property Management
Chapter 2 - Rules for the Bureau of Building, Grounds and Real Property Management
Rule 12-3-2.1 - Policies and Procedures
Section 12-3-2.1-600 - PLANNING PROCEDURES
SCHEMATIC DESIGN PHASE
Section 12-3-2.1-600.8 - THE SCHEMATIC DESIGN
The Schematic Design Documents generated by the Professional consist of a written report as well as preliminary drawings. The following paragraphs outline general requirements for the Schematic Design phase and the submissions of required data.
Although the Schematic Design phase is general and non-specific in nature by comparison to other planning phases, importance should be given to detail and direction from the very beginning in order to utilize time and expend funds wisely.
These phases will be discussed and enumerated individually over the next several pages.
Schematic Design Phase * Program or Scope Definition * Site Analysis * Design Concept * Conceptual Drawings * Visual Studies * Design Concept Approval |