Section 12-3-2.1-500 - PREPLANNING PROCEDURES
SCHEMATIC DESIGN PHASE
Section 12-3-2.1-500.18 - SUBMISSION TO THE LEGISLATURE
Current through September 24, 2024
If the planning of this Project was mandated by the Legislature, after final approval, the Professional will provide the Bureau with ten (10) sets of the complete preplanning documents for submission to the Legislature. The sets will include, but not be limited to, the following:
1. Visual Presentation: A colored print of the prospective is preferred; however, if one was not prepared, an elevation or building sketch conveying the facility's design and character will be necessary.
2. Program: A copy of an executive summary, or the entire Program document.
3. Drawings: Half scale set of all drawings.
4. Cost Estimate: Cost estimate prepared in a format required by the Bureau.