Minnesota Administrative Rules
Agency 167 - Pollution Control Agency
Chapter 7081 - MIDSIZED SUBSURFACE SEWAGE TREATMENT SYSTEMS
Part 7081.0180 - SOIL INTERPRETATION FOR SYSTEM DESIGN
Current through Register Vol. 49, No. 13, September 23, 2024
Subpart 1. Site and soil information.
Site and soil information gathered in parts 7081.0160 and 7081.0170 must be interpreted for suitability for MSTS siting, design, and construction, with consideration of the following:
Subp. 2. Flood fringes.
Systems proposed to be located in flood fringes must determine feasibility of relocating the system outside the floodplain.
Subp. 3. Depth.
The limiting layer in the soil shall be determined based on the depth of bedrock or periodically saturated soil if encountered. The depth to the periodically saturated soil shall be determined according to part 7080.1720, subpart 5, item E, and the depth of bedrock shall be as defined under part 7080.1100, subpart 8.
Statutory Authority: MS s 115.03; 115.55