Subpart 1. Flow capacity.
Five points shall be assigned to a project if the project involves a treatment facility addressed by the project that is operating at or above 85 percent of its NPDES or SDS permitted hydraulic flow or organic loading capacity, or a collection facility that is operating at or above 85 percent of its hydraulic design capacity, or both, and if the project would expand capacity or reduce loadings so that the facility will operate at less than 85 percent of its capacity.
Subp. 2. Age of facilities.
Twenty points shall be assigned to a project if construction of all or a substantial portion of the existing facility addressed by the project was completed more than 20 years before the date the agency received the request for priority listing of the project proposal.
Subp. 3. Excessive infiltration or inflow.
Fifteen points shall be assigned if the existing facility has excessive infiltration or inflow and the project proposal includes measures to correct the excessive infiltration or inflow.
Subp. 4. Land discharge.
Twenty points shall be assigned under this subpart for a project that meets either or both of the requirements in items A and B.
Subp. 5. Effluent limit more stringent than secondary treatment.
Ten points shall be assigned if the existing facility is subject to effluent limits for carbonaceous biochemical oxygen demand or total suspended solids that are more stringent than those which must be attained by a secondary treatment facility under part 7050.0211, or has an ammonia, total nitrogen, or phosphorus permit limit.
Subp. 6. Ponds in karst areas; separation of disposal system from groundwater.
Twenty points shall be assigned under this subpart for a project that meets either or both of the requirements in items A and B.
Subp. 7. Projects with effluent discharge violations.
Five points shall be assigned if the existing wastewater treatment facility is currently in violation of permit effluent limits that exceed the criteria for noncompliance reporting in the NPDES program under Code of Federal Regulations, title 40, section 123.45, appendix A, and the project is designed to remedy the violation.
Subp. 8. Projects addressing repeated facility failures.
Ten points shall be assigned if a wastewater treatment or collection facility addressed by the project has experienced bypasses, overflows, or surcharges during two or more storm events within a 12-month period when operating at less than peak instantaneous wet weather flow, and if the project is designed to eliminate such failures.
Subp. 9. Discharges to impaired or outstanding resource value waters.
Subp. 10. Proximity to potable water intake.
Five points shall be assigned if the existing facility discharges into surface water and there is an intake for potable water less than 25 miles downstream from the point of discharge.
Subp. 11. Endangered or threatened species.
Five points shall be assigned if the existing facility discharges into surface water and the water downstream of the discharge supports any endangered or threatened species listed in parts 6134.0200 to 6134.0400 or designated under Code of Federal Regulations, title 50, section 17.11 or 17.12.
Subp. 12. New standards more stringent.
Ten points shall be assigned if the project improves the operation of an existing wastewater treatment facility to address one or more of the following circumstances:
Subp. 13. Receiving water classification.
Up to seven points shall be assigned based on the classification of the receiving water as provided in this subpart if the existing facility discharges into surface water. If the receiving water has multiple classifications, only the classification with the highest point value under this subpart shall be used.
Receiving Water Classification | Points | |
2A | 7 | |
1,2Bd | 5 | |
2B,2C,2D | 3 | |
7 | 1 |
Subp. 14. Effluent impact on receiving water.
Subp. 15. Project implements corrective measures.
Five points shall be assigned to a project if it implements actions that contribute to the correction of a water quality problem identified in one or more of the following studies or an equivalent study:
Subp. 16. Project helps meet total maximum daily load for receiving water.
Twenty points shall be assigned to the project if the project contributes to the achievement of a total maximum daily load (TMDL). To be considered as contributing to the achievement of a TMDL, the project must:
Subp. 17. New or expanded discharge; points subtracted.
Five points shall be subtracted from the project's priority score if the project involves one or more of the following:
For purposes of this subpart, if a reissued permit for a facility incorporates limits on pollutant loading which were frozen in a previous permit, a facility operating under the same limits in the reissued permit shall not be considered to have an expanded discharge.
Subp. 18. Beneficial use of wastewater.
Thirty points shall be assigned if a project will result in an agency-approved beneficial use of wastewater that results in reducing or replacing the use of groundwater, surface water, or potable water, provided that the project component resulting in the beneficial use of wastewater accounts for at least 20 percent of the total eligible cost of the project. Projects receiving points under subpart 4 for land discharge shall not receive points under this subpart for additional land discharge.
Statutory Authority: MS s 103F.745; 115.03; 116.182; 446A.07