Minnesota Administrative Rules
Agency 167 - Pollution Control Agency
Chapter 7045 - HAZARDOUS WASTE
FACILITY STANDARDS
Part 7045.0488 - CLOSURE ACTIVITIES
Current through Register Vol. 49, No. 13, September 23, 2024
Subpart 1. Time allowance to begin closure activities.
Within 90 days after receiving the final volume of hazardous waste, or the final volume of nonhazardous waste if the owner or operator complies with all applicable requirements of subpart 2a, at a hazardous waste management unit or facility, the owner or operator shall treat, remove from the unit or facility, or dispose of on-site all hazardous waste in accordance with the approved closure plan. The commissioner may approve a longer period if the owner or operator demonstrates at least 30 days before expiration of the 90 day period, that the owner or operator has taken and will continue to take all steps to prevent threats to human health and the environment, including compliance with all permit requirements and:
If the owner or operator of a facility required to maintain financial assurance for closure, postclosure care, or corrective action fails to make a required payment or to substitute alternative financial assurance when required to do so, the commissioner shall order the owner or operator to begin closure activities.
Subp. 2. Time extension for closure activities.
The owner or operator shall complete partial and final closure activities in accordance with the approved closure plan and within 180 days after receiving the final volume of hazardous waste, or the final volume of nonhazardous waste if the owner or operator complies with all applicable requirements in subpart 2a, at the hazardous waste management unit or facility. The commissioner may approve a longer closure period if the owner or operator demonstrates at least 30 days before expiration of the 180 day period that the owner or operator has taken, unless the owner or operator is otherwise subject to the deadlines of subpart 2a, and will continue to take all steps to prevent threats to human health and the environment from the unclosed but not operating hazardous waste management unit or facility, including compliance with all applicable permit requirements and:
If operation of the site is recommended, the commissioner may defer completion of closure activities until the new operation is terminated.
Subp. 2a. Conditions for receiving nonhazardous waste.
The commissioner shall allow an owner or operator to receive only nonhazardous waste in a landfill, land treatment, or surface impoundment unit after the final receipt of hazardous waste at that unit if:
If the owner or operator of a surface impoundment is not in compliance with the liner and leachate collection system minimum technology requirements of part 7045.0532, subpart 3, the owner or operator may not delay closure in order to accept nonhazardous wastes.
Subp. 3. Disposal or decontamination of equipment, structures, and soils.
During the partial and final closure periods, all contaminated facility equipment, structures, and soils must be properly disposed of or decontaminated unless otherwise specified in part 7045.0528, subpart 9; 7045.0532, subpart 7; 7045.0534, subpart 7; 7045.0536, subpart 8; or 7045.0538, subpart 7, or under the authority of part 7045.0539, subparts 2 and 4. By removing any hazardous waste or hazardous waste constituents during partial and final closure, the owner or operator may become a generator of hazardous waste and must handle that waste according to all applicable requirements of parts 7045.0205 to 7045.0325.
Subp. 4. Certification of closure.
Within 60 days after each hazardous waste management unit is closed, and within 60 days after final closure is completed, the owner or operator shall submit to the commissioner, by registered mail, certification by the owner or operator and by an independent registered professional engineer that the hazardous waste management unit or facility, as applicable, has been closed in accordance with the specifications in the approved closure plan.
Documentation supporting the independent registered professional engineer's certification must be furnished to the commissioner upon request until the commissioner releases the owner or operator from the financial assurance requirements for closure under part 7045.0504, subpart 10.
Statutory Authority: MS s 14.07; 116.07; 116.37