Minnesota Administrative Rules
Agency 167 - Pollution Control Agency
Chapter 7041 - SEWAGE SLUDGE MANAGEMENT
Part 7041.3100 - PROCEDURE TO DETERMINE ANNUAL WHOLE SLUDGE APPLICATION RATE (AWSAR)
Current through Register Vol. 49, No. 13, September 23, 2024
A. This part contains the procedure used to determine the AWSAR for a sewage sludge that does not cause the annual pollutant loading rates in part 7041.1100, subpart 4, item D, to be exceeded. The relationship between the annual pollutant loading rate (APLR) for a pollutant and the AWSAR for a sewage sludge is shown in the equation in this subpart.
APLR = C x AWSAR x 0.001
Where,
APLR = Annual pollutant loading rate in kilograms per hectare per 365-day period.
C = Pollutant concentration in milligrams, per kilogram of total solids (dry weight basis).
AWSAR = Annual whole sludge application rate in metric tons per hectare per 365-day period (dry weight basis).
B. To determine the AWSAR, the equation in subpart one is rearranged as follows:
AWSAR = | APLR _____ C x 0.001 |
The procedure used to determine the AWSAR is described in subitems (1) to (4).
Statutory Authority: MS s 116.07