Minnesota Administrative Rules
Agency 167 - Pollution Control Agency
Chapter 7025 - LEAD PAINT REMOVAL
ABRASIVE BLASTING OF LEAD PAINT FROM RESIDENTIAL, CHILD CARE, AND SCHOOL BUILDINGS
Part 7025.0050 - CONTAINMENT
Current through Register Vol. 49, No. 13, September 23, 2024
Subpart 1. Containment required.
The contractor shall apply containment, using the methods required by this part, before using abrasive blasting to remove lead paint from the exterior of a residential, child care, or school building, or a building within 100 feet of a residential, child care, or school building, or a playground. The contractor may utilize methods of removal by abrasive blasting or of containment other than those specified in this part only if the commissioner approves the alternative method of removal or containment in writing prior to its use. The commissioner shall approve the alternative method of removal or containment if the contractor demonstrates that the alternative containment method will prevent contamination of soil and house dust at least as well as the methods specified in this part.
Subp. 2. Sealing the residential, child care, or school building.
Before abrasive blasting begins, the contractor shall:
The contractor shall not conduct abrasive blasting if any windows or doors are open on any wall that faces the wall to be abrasive blasted, and on the adjoining walls to a distance of 50 feet from the wall to be abrasive blasted, of a neighboring residential, child care, or school building that is within a distance from a wall to be abrasive blasted that is less than or equal to the distance of ground cover required by subpart 3.
Subp. 3. Ground cover.
Before abrasive blasting begins, the contractor shall completely cover, with impermeable tarpaulins, the ground beneath the wall or structure to be abrasive blasted by:
Subp. 4. Additional containment required.
If visible emissions of particulate matter occur in the air or visible deposits occur on the ground at a distance from the structure greater than the distance of the ground cover, then the contractor shall immediately cease abrasive blasting until the contractor:
Statutory Authority: MS s 116.07; 144.878