Minnesota Administrative Rules
Agency 158 - Natural Resources Department
Chapter 6130 - FERROUS METALLIC MINERAL MINING
TACONITE AND IRON ORE RECLAMATION STANDARDS
Part 6130.2100 - STOCKPILE DESIGN AND CONSTRUCTION STANDARDS
Current through Register Vol. 49, No. 13, September 23, 2024
All stockpiles shall be designed and constructed according to the following standards:
A. Existing stockpiles shall be incorporated or extended to the extent possible.
B. Water shall be drained away from the top of any stockpile in a manner which will not adversely affect the structural stability of the stockpile and will minimize erosion.
C. All runoff and drainage control measures shall be designed to withstand a 100-year frequency, 24-hour duration storm as developed using good hydraulic and hydrologic practices.
D. If runoff from stockpiles has caused or is likely to cause violations of water quality standards, the runoff shall be collected and held in a settling basin until it meets, or is treated to meet, effluent limitations.
E. Runoff or drainage controls shall be designed by a qualified person proficient in hydrologic analysis and water channel design.
F. When a water quality problem has occurred or is likely to result from leaching of stockpiled material, the commissioner shall require one or more of the following based on the type of material and the nature and location of the problem:
Statutory Authority: MS s 93.47