Subpart 1. IBC section 1502.1.
IBC section 1502.1 is amended and subsections are added to read as follows:
Subp. 1a. IBC section 1502.2.
IBC section 1502.2 is amended and subsections and Table 1502.2.3 are added to read as follows:
TABLE 1502.2.3 SCUPPER SIZING a
Square feet of Roof Area | |||||||
Head Height in Inchesb | Length of Weir in inches | ||||||
4 | 6 | 8 | 12 | 16 | 20 | 24 | |
1 | 273 | 418 | 562 | 851 | 1139 | 1427 | 1715 |
2 | 734 | 1141 | 1549 | 2365 | 3180 | 3996 | 4813 |
3 | 1274 | 2023 | 2772 | 4270 | 5768 | 7267 | 8766 |
4 | 1845 | 2999 | 4152 | 6460 | 8766 | 11073 | 13381 |
6 | 2966 | 5087 | 7204 | 11442 | 15860 | 19918 | 24160 |
a Table based upon 4-inch per hour rainfall.
b Minimum 1-inch vertical free space above Head (H) is required.
Subp. 2. IBC section 1502.3.
IBC section 1502.3 is deleted in its entirety.
IBC section 1510.2.2 is amended to read as follows:
Exception: Accessory uses necessary for the maintenance of building systems shall be permitted when the penthouse is sprinkled in accordance with Section 903.1.1.