Minnesota Administrative Rules
Agency 138 - Public Utilities Commission
Chapter 7855 - CERTIFICATE OF NEED; LARGE ENERGY FACILITY
ADDITIONAL INFORMATION FOR FUEL CONVERSION FACILITIES
Part 7855.0300 - PROPOSED FUEL CONVERSION FACILITY; DESCRIPTION
Universal Citation: MN Rules 7855.0300
Current through Register Vol. 49, No. 13, September 23, 2024
Each application for a fuel conversion facility shall contain the following information:
A. a physical description of the facility, including:
(1) its location, to the fullest extent
known;
(2) an estimate of the
required land area and the height of the tallest structures;
(3) its design capacity in tons per hour of
input material;
(4) a schematic
drawing showing major components of the facility; and
(5) a map showing the planned location of the
facility and its interconnections with energy transportation systems;
B. data regarding design and construction of the facility, including:
(1)
if known, the complete name and business address of the engineer and firm that
would be responsible for the design of the facility;
(2) if known, the complete name and business
address of the company that would construct the facility;
(3) the proposed date for commencing
construction and the proposed in-service date;
(4) the estimated installed cost of the
facility in current dollars; and
(5) the estimated economic life of the
facility; and
C. data regarding operation of the facility, including:
(1) a narrative description of the steps of
the process;
(2) the types and
sources of input materials that would be processed by the facility and the
estimated energy content of each in Btu per appropriate unit of
measure;
(3) the types of output
products, the amount of each, and the estimated energy content of each in Btu
per appropriate unit of measure;
(4) the projected annual operating and
maintenance costs in current dollars for each of the first five calendar years
of operation;
(5) a description of
the methods that would be used to transport input and output materials to and
from the facility;
(6) the
estimated amounts and types of energy products that would be consumed during
operation at the design capacity;
(7) the expected average percentage of use of
the full design capacity for each of the first five calendar years of
operation; and
(8) a discussion of
the maintenance requirements of the facility, including the estimated impact on
production.
Statutory Authority: MS s 216B.08; 216B.2421; 216B.243; 216C.10
Disclaimer: These regulations may not be the most recent version. Minnesota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.