Part 7851.0280 - LOAD AND CAPACITY INFORMATION
Current through Register Vol. 49, No. 13, September 23, 2024
In a joint application, separate responses are required from each person for information required by this part.
The applicant shall describe the ability of its existing facilities to meet the demand forecast in part 7851.0270 and the extent to which the proposed facility will increase this capability. In preparing this description, the applicant shall provide, for the last calendar year, the current calendar year, the first full calendar year before the proposed facility is expected to be in operation, and the first full calendar year of operation of the proposed facility:
A. an annual load duration curve consisting of a single graph for each year and accompanying tables indicating the total monthly consumption of gas in the following classifications:
B. for a utility, an annual supply curve consisting of a single graph for each year and showing the contributions from:
C. for a pipeline company, an annual supply curve showing the contributions from:
D. the applicant's design day availability and the mean temperature assumed for the design day.