Subpart 1. General contents.
Each application shall contain a general information section that shall include the following information:
A. the applicant's complete name and address,
telephone number, and standard industrial classification codes;
B. the complete name, title, address, and
telephone number of the official or agent to be contacted concerning the
applicant's filing;
C. a brief
description of the proposed facility, its complete address (if known) or
general location, a brief description of its planned use, its estimated cost,
its planned in-service date, and its design capacity, in gallons for liquefied
gas storage, in Mcf or equivalent Mcf for underground gas storage, or its
length in miles and maximum design throughput in gallons per day or Mcf per day
for gas pipelines;
D. the total fee
for the application as prescribed by part
7851.0210, and the amount of the
fee submitted with the application; and
E. the signatures and titles of the
applicant's officers or executives authorized to sign the application, and the
signature of the preparer of the application if prepared by an outside
agent.
Subp. 2. List of government agencies.
Each application shall contain a schedule in the general information section that lists all known federal, state, and local agencies or authorities with which the applicant must file for the proposed facility. The following information shall be included on the schedule:
A. the names of all known federal, state, or
local agencies or authorities with which the applicant must file;
B. the title of each permit or certificate
issued by the authorities named in response to item A;
C. for each permit or certificate listed in
response to item B, the date an application was filed or the projected date of
future application;
D. for each
permit or certificate listed in response to item B, the actual date a decision
was made on the application, or the anticipated decision date; and
E. for each permit or certificate listed in
response to item B, for which an application was filed, the disposition or
status of the permit or certificate.
Statutory Authority: MS s 216B.08; 216B.2421; 216B.243; 216C.10
Disclaimer: These regulations may not be the most recent version. Minnesota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.