Michigan Administrative Code
Department - Licensing and Regulatory Affairs
Public Service Commission
Interconnection and Distributed Generation Standards
Part 2 - INTERCONNECTION STANDARDS
Section R. 460.986 - Insurance
Current through Vol. 24-22, December 15, 2024
Rule 86.
(1) An applicant interconnecting a level 1 or 2 project to the distribution system of an electric utility may not be required by the electric utility to obtain any additional liability insurance.
(2) An electric utility shall not require an applicant interconnecting a level 1 or 2 project to name the electric utility as an additional insured party.
(3) For a level 3 project, the applicant shall obtain and maintain general liability insurance of a minimum of $1,000,000.
(4) For a level 4 project, the applicant shall obtain and maintain general liability insurance of a minimum of $2,000,000.
(5) For a level 5 project, the applicant shall obtain and maintain general liability insurance of a minimum of $3,000,000.
(6) For level 3, 4, and 5 projects, the electric utility may describe in its interconnection procedures required terms and conditions that must be specified in the general liability insurance.