Michigan Administrative Code
Department - Licensing and Regulatory Affairs
Bureau of Construction Codes
Manufactured Housing
Part 9 - COMMUNITY CONSTRUCTION
Section R. 125.1932 - Community electrical system

Universal Citation: MI Admin Code R. 125.1932

Current through Vol. 24-16, September 15, 2024

Rule 932. A community electrical system shall, at a minimum, be designed, installed, operated, and maintained in compliance with the rules entitled "Electrical Lines and Equipment," being R 460.811 to R460.815 and according to the construction, installation, and safety standards of the servicing public service company. A community is responsible for installing the electrical system up to and including the meter and its disconnect in new or existing communities. In addition, all of the following provisions shall be complied with:

(a) Primary and secondary distribution lines shall be installed underground.

(b) The system shall be designed to provide, at a minimum, 100 amp service according to applicable standards.

(c) A home site shall have an approved individual weatherproof meter installed. A community master meter shall not be used.

Disclaimer: These regulations may not be the most recent version. Michigan may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.