Michigan Administrative Code
Department - Licensing and Regulatory Affairs
Bureau of Construction Codes
Manufactured Housing
Part 9 - COMMUNITY CONSTRUCTION
Section R. 125.1932 - Community electrical system
Current through Vol. 24-16, September 15, 2024
Rule 932. A community electrical system shall, at a minimum, be designed, installed, operated, and maintained in compliance with the rules entitled "Electrical Lines and Equipment," being R 460.811 to R460.815 and according to the construction, installation, and safety standards of the servicing public service company. A community is responsible for installing the electrical system up to and including the meter and its disconnect in new or existing communities. In addition, all of the following provisions shall be complied with:
(a) Primary and secondary distribution lines shall be installed underground.
(b) The system shall be designed to provide, at a minimum, 100 amp service according to applicable standards.
(c) A home site shall have an approved individual weatherproof meter installed. A community master meter shall not be used.