Michigan Administrative Code
Department - Licensing and Regulatory Affairs
Bureau of Construction Codes
Manufactured Housing
Part 10 - COMMUNITY BUSINESS PRACTICES
Section R. 125.2006a - Water meter installation disclosure
Current through Vol. 24-16, September 15, 2024
Rule 1006a. If the community converts its water metering to individual site metering, then the community shall notify each then-current resident, in writing, not less than 30 days before providing water for which an invoice is rendered following meter installation. The disclosure shall include, but not be limited to, all of the following items:
(a) The water and sewer rate per thousand gallons or in the units measured by the meter.
(b) All additional charges.
(c) Minimum fees.
(d) Shutoff procedures.
(e) Installation procedures.
(f) Payment procedures, including the billing period and due dates and a requirement that bills include beginning and ending meter readings and total usage.
(g) Rate change procedures.
(h) A statement that the community shall provide a state-approved and properly functioning heat tape and shall be maintained by the community for a period of not less than 1 year.