Part 5 - RESIDENTIAL CODE
Section R. 408.30535 - Connection

Universal Citation: MI Admin Code R. 408.30535

Current through Vol. 24-16, September 15, 2024

Rule 535. Section P3111.2.2 of the code is amended to read as follows:

P3111.2.2. Connection. The combination waste and vent systems shall be provided with a dry vent connected to a point within the system or the system shall connect to a horizontal drain that is vented in accordance with one of the methods specified in this chapter. Combination waste and vent systems connecting to building drains receiving only the discharge from a stack or stacks shall be provided with a dry vent. The vent connecting the combination waste and vent pipe shall extend vertically not less than 6 inches (152 mm) above the flood level rim of the highest fixture being vented before offsetting horizontally.

Disclaimer: These regulations may not be the most recent version. Michigan may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.