Code of Massachusetts Regulations
990 CMR - HAZARDOUS WASTE FACILITY SITE SAFETY COUNCIL
Title 990 CMR 16.00 - Developer Siting Fees (m.g.l. C. 21d, Section 4)
Section 16.03 - Determination of Fee(s) Required

Universal Citation: 990 MA Code of Regs 990.16
Current through Register 1531, September 27, 2024

The payment(s) made along with the Submission ofthe Notice ofIntent shallbe based on the initial estimated construction cost ofthe facility. The payment(s) made subsequent to Council determination that the Final Socio-Economic Appendix is adequate shall be determined by the facility's construction cost, incorporatingtherequirementsimposed onthe facility's designby the negotiated siting agreement. In determining the fee(s), the Council shall also take into account the cost imposed by the draft facility permit issued by the Department of Environmental Quality Engineering, pursuant to M.G.L. c. 21C, if such a draft permit has been issued.

Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.