Code of Massachusetts Regulations
780 CMR - STATE BOARD OF BUILDING REGULATIONS AND STANDARDS
Chapter CHAPTER 51 - MASSACHUSETTS RESIDENTIAL CODE
Appendix AF - RADON CONTROL METHODS - ADOPT AS REVISED
Section AF101.1 - General

Current through Register 1543, March 14, 2025

Revise and replace section AF101.1 General as follows:

This appendix contains minimum requirements for new construction in the high radon potential counties as listed in Table AF101(1) regardless of the radon levels at the site. These requirements are intended to provide a passive means of resisting radon gas entry and prepare the dwelling for post-construction radon mitigation, if necessary. See Figure AF102. Active construction techniques, rather than passive techniques, shall be permitted to be used where approved.

Alternatively, the passive system requirements of ANSI/AARST Standard Designation #CCAH: Reducing Radon in New Construction of One & Two Family Dwellings and Townhouses, 2013 may be used for new construction in Zone 1, or approved equal system.

Irrespective of which approach is used, no testing is required as follows:

1. for the radon levels at the site prior to construction;

2. for the radon control system when completed; or

3. in the building after completion of the project.

Therefore, such testing shall not be a condition of issuing a certificate of occupancy.

Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.