Code of Massachusetts Regulations
780 CMR - STATE BOARD OF BUILDING REGULATIONS AND STANDARDS
Chapter 19 - Concrete
Section 1905 - CONCRETE QUALITY, MIXING AND PLACING
- Subsection 1905.1 - General
- Subsection 1905.2 - Selection of concrete proportions
- Subsection 1905.3 - Proportioning on the basis of field experience and/or trial mixtures
- Subsection 1905.4 - Proportioning without field experience or trial mixtures
- Subsection 1905.5 - Average strength reduction
- Subsection 1905.6 - Evaluation and acceptance of concrete
- Subsection 1905.7 - Preparation of equipment and place of deposit
- Subsection 1905.8 - Mixing
- Subsection 1905.9 - Conveying
- Subsection 1905.10 - Depositing
- Subsection 1905.11 - Curing
- Subsection 1905.12 - Cold weather requirements
- Subsection 1905.13 - Hot weather requirements
Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.