Code of Massachusetts Regulations
522 CMR - BOARD OF BOILER RULES
Title 522 CMR 4.00 - Heating Boilers and Other Heat Storage Sources
Section 4.03 - Reconstruction, Including Welded Repairs, Major Repairs and Alterations

Universal Citation: 522 MA Code of Regs 522.4
Current through Register 1531, September 27, 2024

All reconstruction, including Repairs and Alterations performed to bring the vessel to the original code of construction, as stamped on the Boiler, shall be done in accordance with the provisions of M.G.L. c. 146, § 2, 2019 NBIC Part 3, and the 2019 ASME Boiler and Pressure Vessel Code Section IV, Rules for Construction of Heating Boilers.

Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.