Code of Massachusetts Regulations
360 CMR - MASSACHUSETTS WATER RESOURCE AUTHORITY
Title 360 CMR 10.000 - Sewer Use
LANDFILL DISCHARGE PERMITS
Section 10.074 - Permit Modifications

Current through Register 1531, September 27, 2024

(1) A permittee shall provide written notification to the Authority at least 30 days prior to taking any action which will change the volume or nature of the discharge including, but not limited to, the following actions:

(a) expansion of the Landfill; or

(b) alteration to the Pretreatment system or the operation of the Pretreatment system.

(2) The Authority will review each notification and will thereafter inform the permittee whether the proposed change requires modification of the Permit. If Permit modification is necessary, the permittee shall file an application for a Permit modification as required by the Authority, and shall not change or alter its Discharge, unless and until the Authority approves the Permit modification.

Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.