Section 9.21 - Variances
Current through Register 1531, September 27, 2024
(1) Required Findings. The Commissioner may waive the application of any other section of 310 CMR 9.00 by making a written finding following a public hearing that:
(2) Procedure
(3) Commentary. The variance process is intended to apply in the rare and unusual circumstance where a proposed project satisfies a public interest which overrides the public interest in waterways but cannot be implemented in a manner which is fully consistent with the provisions of 310 CMR 9.00; where application of 310 CMR 9.00 would so restrict the use of private property as to constitute an unconstitutional taking of property; or where application of 310 CMR 9.00 would cause substantial hardship for the continuation of a use or structure existing as of October 4, 1990. The variance process is designed to ensure that a full investigation is made to determine whether the proposed project serves an overriding public interest which outweighs harm to the public resulting from lack of adherence to 310 CMR 9.21 and whether all measures are taken which ensure that detriments to the public interests in waterways are minimized.