(4) For all Temporary Solutions where
achievement of a Permanent Solution is not currently feasible as described at
310 CMR 40.1050(1)(e) 1., except those achieved after a Downgradient Property
Status Submittal has been provided to the Department in accordance with
310
CMR 40.0180:
(a) a copy of the plan as specified in
310
CMR 40.0861(2)(h) that
presents definitive and enterprising steps to be taken toward achieving a
Permanent Solution at the disposal site or portion of a disposal site shall be
submitted with the Temporary Solution Statement and as part of any Periodic
Review of the Temporary Solution as specified at 310 CMR 40.1050(4)(b);
and
(b) a Periodic Review of the
Temporary Solution shall be conducted every fifth year after the date of filing
the Temporary Solution Statement, until such time that a Permanent Solution
Statement is submitted. Such Periodic Review Opinion shall address the
following:
1. the effectiveness of the
Temporary Solution(s), including confirmation that a condition of No
Substantial Hazard has been maintained;
2. the scope and effectiveness of any
remedial actions taken since the submittal of the Temporary Solution Statement
or the most recent Periodic Review of a Temporary Solution, if
applicable;
3. the definitive
and/or enterprising steps pursuant to
310
CMR 40.0861(2)(h) taken
since the submittal of the Temporary Solution Statement or the most recent
Periodic Review of a Temporary Solution, if applicable, and planned for future
to identify, develop and implement a feasible Permanent Solution at the
site;
4. the feasibility of
implementing one or more Permanent Solutions for the disposal site or
portion(s) of the disposal site pursuant to
310
CMR 40.0860 at the time of the Periodic
Review, and if a Permanent Solution is feasible, the projected schedule for
achieving it;
5. any changes in
activities, uses and/or exposures that may cause an actual or potential
increase in exposure for human or environmental receptors to oil and/or
hazardous material;
6. if
applicable, an evaluation of any Activity and Use Limitation implemented as
part of the Temporary Solution, including compliance with the terms of the
Activity and Use Limitation, its effectiveness in maintaining a condition of No
Substantial Hazard, and identification of any response actions necessary to
maintain a condition of No Substantial Hazard;
7. any necessary and required response
actions to maintain the Temporary Solution, including a description of the type
and frequency of monitoring to be conducted and any contingencies for ensuring
the effectiveness of the Temporary Solution during the period prior to the next
Periodic Review; and
8. the
certification required in
310
CMR 40.0009; and
(c) a valid Tier Classification or Extension
thereof shall be in effect at the time the Temporary Solution Statement is
submitted to the Department and until the time a Permanent Solution Statement
is submitted to the Department; the submittal of the Periodic Review of the
Temporary Solution and Post-temporary Solution Status Report, as specified
pursuant to
310
CMR 40.0898(1)(e), shall
have the effect of maintaining a Tier Classification or Extension and further
Comprehensive Response Actions shall be conducted in accordance with
310
CMR 40.0800.