Section 40.0875 - As-built Construction Report

Current through Register 1531, September 27, 2024

(1) As-built Construction plans shall be prepared and submitted to the Department in an As-built Construction Report for:

(a) any disposal site where an Engineered Barrier, cap or other on-site system for the containment and/or physical immobilization of oil and/or hazardous material is constructed as part of the Remedial Action Alternative; or

(b) any disposal site where the Comprehensive Remedial Alternative as actually constructed varies significantly from the description of the alternative provided in the RIP under 310 CMR 40.0874.

(2) The As-built Construction Report shall include, without limitation, the following information:

(a) construction activities conducted, and techniques and materials used;

(b) tests and measurements performed;

(c) any significant modifications of the design or construction of the selected Comprehensive Remedial Alternative as described under 310 CMR 40.0874(3)(c) of the RIP; and

(d) as built drawings.

(3) As-built plans for the Comprehensive Remedial Action shall be prepared in conformance with appropriate engineering and construction standards and practices, and regulations applicable to construction plans and activities.

Disclaimer: These regulations may not be the most recent version. Massachusetts may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.